How Quickly Can You Dive Into Your New Inground Pool?

When considering adding a pool to your property, you might be wondering how long it takes to build an inground pool. The answer isn’t as straightforward as many might hope. Generally, the timeline can range from 8 to 12 weeks on average, but various factors can extend or shorten this timeframe.

The Pool Installation Process

From initial design to the final landscaping, the journey to your new inground pool involves several key stages, each critical to ensuring a perfect outcome.

Initial Design and Planning

The first phase involves designing your dream pool. This step can take anywhere from 1 to 4 weeks. During this period, you’ll collaborate with a designer who will use modern 3D modeling technology to bring your vision to life.

Permitting

Before any actual construction begins, obtaining the necessary permits is crucial. The permitting process varies widely and can last from 2 to 6 weeks. This duration depends on local regulations and the speed at which your local government operates.

Excavation

The physical construction kicks off with excavation, which is generally completed within a week. However, this stage can encounter delays if issues such as difficult access to the site or underground utilities arise.

Structural and Mechanical Work

After the site is prepared, the next two weeks are devoted to laying down the steel for the pool’s structure and installing plumbing and electrical systems. This phase ensures that the foundational aspects of your pool are robust and will function effectively.

Pool Installation

The actual pool installation process typically spans 1 to 3 weeks. The duration here depends on the complexity of your pool design and the scheduling availability of the necessary crew.

Finishing Touches

The final touches include decking, landscaping, and any custom features like lighting or water features. This stage can take another 1 to 4 weeks, heavily dependent on the extent and complexity of the features being added.

Accelerating the Installation Timeline

You can ensure a quicker inground pool installation by doing the following:

  • Consider starting the pool installation during the off-peak seasons, like fall or winter. During spring and summer, pool installers are in high demand, which can lead to longer wait times.
  • Prepare the site where the pool will be installed well in advance.
  • Handle all permits and necessary paperwork as soon as possible.

Dive Into Your Dream Pool With Us

If you’re wondering how long it takes for an inground pool and are ready to start the process, our team at Georgia Classic Pool is here to guide you every step of the way. As experienced Atlanta pool contractors, we pride ourselves on our commitment to quality and customer satisfaction.